Ageto Projects
Behind-the-meter and off-grid power solutions
Filter Projects
ALL
Behind-the-Meter
Off-Grid
-
Calistoga, CA
-
Fort Collins, CO
-
Calistoga, CA
-
Redlands, CA
-
Pacific Aquafarms built an off-grid microgrid to support a portion of the fish farm just off the Saltan Sea which raises high quality tilapia and catfish for the live market. With large pumps and motor loads, the energy usage was driving the operating costs higher, which was solved by the solar and energy storage microgridNiland, CA
-
Ageto collaborated with the Laboratory for Energy And Power Solutions (LEAPS) at Arizona State University on a successful proposal for the Defense University Research-to-Adoption (DURA) initiative through the Office of Naval Research (ONR) titled ‘Electric Grid Reliability, Resiliency, and Security’Mesa, AZ